Eurobank – IT Center
Bank’s data center in Athens. IT equipment area 650m2, provisional extension 50%. Infrastructure performance class TIER IV according to Uptime Institute.
SIGMAMI: (a) Project manager of the design, construction and commissioning of the building and infrastructure systems
(b) Construction supervision.
The project was approved by the IBM Technologies Center Team. Total project duration 11 months (2005-2006).